NEIGHBORHOOD COMMITTEE OF ARCHITECTURE
COLORS, MATERIALS AND LANDSCAPE
THIS
INFORMATION MUST BE COMPLETED AS PART OF
FORMAL APPLICATION PRIOR TO ACCEPTANCE
(Revised 09/22/09)
Complete all items that
apply to your project. If matching existing, just state so (photos are required when matching existing).
- Exterior Color _________________ LRV (20-70)
__________ Brand ______________ (provide sample)
- Trim Color _____________________ LRV ______________
Brand ______________ (provide sample)
- Stone Color ________________________ Brand
____________________________ (provide sample)
- Stucco texture
_______________________________________________________________________
- Flat and/or pitched roof ______________ Roof material
color ___________________ (provide sample.)
- Driveway surface material
______________________________________________________________
- Solar panel description:
__________________________ Number of Panels:
___________________
- Solar Panel Framing: ____________________________Inverter/Electrical Location:
________________
- Solar Panel Tilt:
__________________________________ Module Mounting:
__________________
- Sq Ft. of roof to be covered with solar panels:
______________________________________________
- Window frame color (bronze and wood)
__________________________________________________
- Fascia dimensions: ____________________________
Materials: ____________________________
- Support post and/or column sizes (all sides):
______________________________________________
- Other colors or materials:
____________________________________________________________
Landscape must be
installed in all areas visible to the street and adjacent properties prior to
final inspection. I (we) agree to complete the landscape in accordance with the
landscape criteria outlined in the Declaration of Reservations and Development
Guidelines.
The undersigned agrees that
plans and specifications submitted as part of this application will not be
amended without approval from the Neighborhood Committee of Architecture.
The finished structure will be what is represented by these plans and
specifications.
_____________________________________ ______________________________________
Signed
Date